Completed Projects

HARARE

10 RIDGEWAY SOUTH

6 new double storey 4-bedroom, 2 bathroom units with a contemporary design
VICTORIA FALLS

MBANO MANOR HOTEL

5 star 19 room boutique lodge
HARARE

49 WEST ROAD DOUBLE STOREY

Contract From Capital Homes 3 bedrooms, 2½ bathrooms, Upmarket, Duplex/ double Storey, Tiled Floors, Brick under chroma-deck, Granite top kitchen
HARARE

49 WEST ROAD SINGLE STOREY

2 Semi-detached. 2 Bedrooms. Single Storey.
HARARE

90 WEST ROAD DEVELOPMENT

9 free-standing duplex units, Double Storey. Semi-detached. Upmarket. Each 3 bedrooms, 2 bathrooms. Completion March 2019.
HARARE

CHESTER ROAD FLATS

8 new semi-detached 2-bedroom flats have been constructed on 34 Chester Road in Harare.
VICTORIA FALLS 2015-2018

ILALA LODGE HOTEL SECOND EXTENSION

KW Construction project managed the construction of a triple story, 22 room, hotel extension which included the building of a raised walk way and full back of house renovations for Ilala Lodge Hotel. For this project, we worked together with Kiggin Construction, Brown Engineering, BCHOD Consultancy Engineers and InArc Design. KW Construction worked alongside the building contractors, landscaping specialists, interior designers to re-create a whole new section of the hotel in addition to also assisting with the importation and transportation of materials required, the installation of generators, calorifiers, storm water drains and water filtration systems. The project was completed to a high-end finish on time and on budget and subsequently, Kevin was appointed to manage a further extension to that property in 2017/2018.
2015- 2016

PUMA ENERGY

KW Construction assisted with the Puma Energy refurbishment and renovation of 16 service stations in Harare, Bulawayo and Victoria Falls. The renovation and construction work varied from site to site but included fuel tank installations, work on the forecourt and work on grease trap interceptors, electrics, civil works and plumbing. The re-branding of the Puma Energy service stations closely followed the Environment Management Agency (EMA) requirements, where KW Construction ensured the use of natural resources at all times, protecting the environment.
2018

QUAD LOCK UP GARAGE

High Roof. Steel structure. High Lift Jack.
2018

UPMARKET RESIDENTIAL

2018...
2012 & 2016

YORK LODGE

KW Construction supervised the construction of the 4 bedroom expansion at York Lodge in 2012 and then again in 2016 we constructed and managed the renovations of their new and improved back of house.
2018

14 COLLINS AVENUE

3 bedroom, 2 bathroom units
2012-2013 HARARE

18 RIDGEWAY SOUTH

KW Construction worked on the construction and project management of this luxury four, double story, townhouse development. Each townhouse was built at 260m2, with the project including the full scope of services and amenities required in a townhouse complex, including the installation of high spec security systems.....??? SAME AS PRINCESS
2012-2013 HARARE

12 PRINCESS DRIVE

KW Construction worked on the construction and project management of this luxury four, double story, townhouse development. Each townhouse was built at 260m2, with the project including the full scope of services and amenities required in a townhouse complex, including the installation of high spec security systems.....??? SAME AS RIDGEWAY

NEED QUALITY CONSTRUCTION DONE ON BUDGET AND ON TIME?​​

GET IN TOUCH WITH US

WE'D LOVE TO HEAR FROM YOU​